
- Stairway – Before
- Shower – Before
- Kitchen 1
- Kitchen 2
- Hallway
- Stairway – After
- Right Side – Shower
- Left Side – Basin
- WC
- Dormer – Inside
- Room 1
- Room 2
Project Description
Location: Kingsley Road, UK
Year Completed: 2017
Works Done: Full refurb to dormer which includes, 2 rooms, 2 kitchens, wc and shower room
The Challenges
It was a challenge completing this project due to building flats and a dormer above a Pharmacy and Travel Agency. No inconvenience was caused and every precaution was taking to ensure the works were carried out with as little disruption as possible and to a high standard.