Ealing

Project Description

Location: Shrubbery Road, UK
Year Completed: 2017
Works Done:: Full Refurbishment

The Challenges

The challenges in this project were astounding. The kitchen boiler pipes and electric wiring were across all walls and floors. We had to open floor boards and reposition pipes as well as chase the walls for the electrical wiring in this 3 bedroom house.

We provided Gas and Electric Certificates which are required by law to rent or sell the property.

Hounslow

KINGSLEY RD KITCHEN AFTER 1

Project Description

Location: Kingsley Road, UK
Year Completed: 2017
Works Done: Full refurb to dormer which includes, 2 rooms, 2 kitchens, wc and shower room

The Challenges

It was a challenge completing this project due to building flats and a dormer above a Pharmacy and Travel Agency. No inconvenience was caused and every precaution was taking to ensure the works were carried out with as little disruption as possible and to a high standard.